Installation Guide - WPC Composite Fence and Gate

How to Install Your WPC Composite Slat
Fence and Gate System

WPC composite slat fence and gate system installed
Complete Installation Guide

The YSHI WPC Composite Slat Fence and Gate system installs on a concrete footing using expansion bolt anchors. This guide walks through every step: anchoring the posts, assembling and hanging the gate, installing fence panels, setting up the push-button keypad lock, and caring for the system over time.

WPC stands for Wood-Plastic Composite. These boards and posts are engineered to resist the elements without any painting, staining, or sealing. The system uses aluminum post sleeves over a steel base core, with WPC slat boards that lock together in a tongue-and-groove assembly. The result is a clean, low-maintenance fence and gate that looks great from day one.

This guide covers two main components: the gate system (Part 1) and the fence panels (Part 2). If you purchased the keypad lock, Part 3 covers how to install and program it. Read through the full guide before you start so you can plan ahead and avoid common mistakes.


System Dimensions and Coverage

One complete fence section ships as 2 posts and 12 slat panels. The numbers below are what you need to plan post spacing, layout, and board count before you start drilling.

Per Section (2 posts + 12 panels)
Finished width (post outer edge to post outer edge)75 3/8"
Visible panel span between posts69"
Post width (each)3 3/16"
Panels per section12
Posts per section2
Individual Slat Panel
Length67"
Width (face)6 1/8" (tongue-and-groove interlocking)
Thickness0.75"
Planning your run: Each section covers 75 3/8" finished width. For longer runs, multiply sections and add one post where sections meet (the shared post counts for both). Always confirm your total run measurement on site before ordering additional sections.

Good to Know

Panels lock together with a tongue-and-groove joint, so each seam overlaps by about 1/4". Two panels joined measure 12" face width. Panel ends seat 7/8" into the channel on each post, giving a secure, finished look with no exposed edges. Sections connect post-to-post, so you can add sets in a row to extend your fence to any length.

What Comes in the Box (Per Post Unit)

Verify these parts before starting. Each post unit ships with everything needed for that post assembly.

Hardware Included Per Post Unit
Aluminum fence post72" x 3 1/8" x 3 1/8"
Top and bottom rails (set)65 3/4" x 1 1/4" x 1"
Inner post with 4 expansion screws23.5" x 1.5" x 1.5" (base: 3" x 3")
Siding rail72" x 7/8"
Aluminum post cap3 5/16" x 3 5/16"
Aluminum L-clips4 per post unit
Installation screws22 per post unit

Before You Start

Tools You Will Need

DRILL Hammer drill with 12mm masonry bit (at least 5 inches long)
DRILL Cordless drill and driver bits
WRENCH Adjustable wrench
HAMMER Hammer
LEVEL Spirit level
MEASURE Tape measure
SAW Circular saw or hand saw
SAFETY Safety glasses and work gloves

Safety and Planning

Call 811 Before You Dig. Call 811 or visit call811.com before drilling into any concrete or ground surface. This free service marks underground utility lines so you avoid hitting gas, electric, water, or sewer lines. Do this before starting work.
Concrete-Only Installation. Posts must be anchored into fully cured concrete. Do not attempt to set posts into soil, gravel, pavers, or uncured concrete. The expansion bolts require solid concrete to hold safely.

Before starting, confirm the concrete in your installation area is fully cured and structurally sound. Verify your property lines so posts go in the right location. Do not install in high winds, and secure any loose panels that could blow over during the work. Have a helper available for hanging the gate, which requires two people to lift and hang safely.


Part 1
Installing the Gate
1
Install Post Cap Plugs and U-Channels

Start by pressing the two post cap plugs into the open top of the hinge-side post. Then attach the two U-channels to the post. The U-channels run along the post face and guide the door frame into alignment. Make sure both channels are seated straight and flush before moving on.

Diagram showing post cap plugs and U-channel installation

Steps 1-2: Install post cap plugs and U-channels onto the hinge-side post

2
Mount Hinges to the Hinge-Side Post

Attach the gate hinges to the hinge-side post at this stage, before the post goes into the ground. It is much easier to position and secure them while the post is laid flat. Make sure both hinges are aligned vertically and at the correct height to match where they will connect to the door.

3
Mark Anchor Locations and Drill

Place the base plate for the hinge-side post in position on the concrete. Use the base plate as a template and mark two anchor hole locations through the plate onto the concrete surface.

Drill both holes using a 12mm masonry bit. Drill to a minimum depth of 120mm (just under 5 inches). Drilling straight is important: angled holes make the expansion bolts harder to tighten and can reduce holding strength. Wear safety glasses during drilling.

Pro Tip: Wrap a strip of tape around the drill bit at the 120mm mark so you can see exactly when you hit the right depth without stopping to measure.
4
Insert Expansion Anchor Bolts

Drop the expansion anchor bolts into the drilled holes. Tap them in carefully with a hammer until they are fully seated. Do not drive them in hard with heavy blows at this stage: the goal is to seat them in the hole, not to tighten them yet. Over-hammering before the post is in place can make the base plate hard to align.

5
Set, Level, and Tighten the Post

Slide the post sleeve over the base core. The slots on the sleeve should face the correct direction for your installation (toward the door opening). Use a spirit level to confirm the post is perfectly plumb in both directions. Have a helper hold the post while you check level.

Once plumb, fasten the post at two points: one screw at 100mm from the bottom of the post and one at 400mm from the bottom. Recheck level after fastening. Tighten the anchor bolts firmly with an adjustable wrench, but do not over-tighten to the point of cracking the concrete surface.

Diagram showing 12mm drill bit and expansion bolt anchor installation

Steps 5-6: Drill 12mm anchor holes to 120mm depth and insert expansion bolts

6
Assemble the Door Frame

Join the four door frame rails at the corner connectors to form a rectangular door frame. Make sure all corners are square. A square door frame hangs and swings correctly. Use a tape measure to check that both diagonals of the frame are equal length: if they match, the frame is square.

7
Install the Door Boards

Slide the WPC slat boards into the door frame one at a time. Each board locks into the previous one using the tongue-and-groove profile along the edges. Push each board firmly into position until it is fully seated before adding the next. Do not skip boards or try to install them out of order.

Once the final board is in place, confirm the frame is still square and seat the last board fully. The door panel is now complete.

Note: The boards should slide in with moderate hand pressure. If a board is stiff, check that the previous board is fully seated in its groove first.
Diagram showing post leveling and door frame assembly

Steps 7-8: Set post vertically level and assemble the door frame

8
Install the Caster Wheel and Stop Plate

Attach the caster wheel to the bottom of the door frame, positioned 150mm (about 6 inches) in from the inner edge of the door frame. The caster carries some of the door's weight and helps it swing smoothly without dragging. Install the stop plate on the ground at the position where you want the door to rest fully open, so the door does not swing past that point.

9
Attach Hinges to the Door

Align the door-side hinges with the post-side hinges at the same height. Attach the hinges to the door frame. Make sure all hinge screws are fully tightened before proceeding to hang the door.

10
Install the Keypad Lock and Ground Lock

This step is covered in detail in Part 3 of this guide. At this stage, install the mechanical keypad lock through the pre-cut lock opening in the door frame. Also install the drop-bolt ground lock at the bottom rail. The ground lock drops into a ground anchor when the door is closed, adding stability at the base of the door.

See Part 3 for the full lock installation, spindle orientation, and code setup instructions.

11
Install the Latch-Side Post

Set the latch-side post following the same anchor, level, and tighten process used for the hinge-side post (Steps 3 to 5). Before anchoring, hold the door in its closed position to confirm the post placement is correct. The door should close flush with the post face.

Cut the lock opening in the latch-side post where the latch bolt will engage. Install the strike plate in this opening. The strike plate receives the latch when the door closes. See Part 3 for strike plate positioning details.

12
Hang the Door

This step requires two people. Lift the assembled door panel together, align the door hinges with the post hinges, and lower the door onto the hinge pins. Both hinges must engage at the same time. Once the door is on the hinges, test that it swings freely in both directions and that the caster rolls smoothly on the ground.

Two-Person Lift Required. The assembled door is heavy. Do not attempt to hang it alone. An unsupported door can fall and cause injury or damage.

Gate Installation Checklist


Part 2
Installing the Fence Panels

The fence panels can be installed in either a horizontal or vertical board orientation. The post anchoring method is the same for both. Choose your layout before you start: horizontal boards create a modern, layered look, while vertical boards give a more classic fence appearance. The steps below cover the shared process first, then note where horizontal and vertical differ.

13
Install the Post-Side U-Channel on the Fence Side of the Gate Post

Attach a U-channel to the fence side of the gate post. This channel bridges the gate post and the first fence line post and keeps the fence boards properly guided at that junction.

Diagram showing keypad lock and ground lock caster wheel installation

Step 13: Install the door keypad lock and ground-lock caster wheel

14
Install the Bottom Channel and Corner Brackets

Install the bottom channel along the base of the fence run. Fix the corner brackets at each end. The bottom channel holds the fence boards in place at the ground level and prevents them from moving outward at the base.

Horizontal Boards: Maintain a 2.5mm expansion gap on one side of each horizontal panel. This small gap allows the WPC material to expand and contract with temperature changes without warping or buckling.
15
Set the Fence Line Posts

Set each fence post using the same method as the gate posts: mark, drill with a 12mm bit to 120mm depth, insert expansion bolts, sleeve the post, level in both directions, and fasten at 100mm and 400mm from the bottom.

String a line between the gate post and the end point to keep all fence posts aligned. Check each post for plumb before tightening. Once an expansion bolt is tightened, it is very difficult to adjust, so take time to get alignment right.

16
Install Spring Clips on Each Post

Attach three spring clips to each fence post: one near the top, one in the middle, and one near the bottom. The spring clips grip the edge of each board and hold it against the post, keeping the fence face flat and stable. Make sure all three clips are aligned on each post.

17
Prepare and Install the First Board

For horizontal boards: Cut 5mm x 40mm relief pockets into each lower corner of the first board where it meets the corner brackets. This clearance cut prevents the board from binding against the bracket hardware.

For vertical boards: Cut approximately 70mm from the bottom of the first board where it would otherwise conflict with the bottom-rail brackets.

Lower the first board into the bottom channel and press it against the spring clips on each post. Make sure it is fully seated in the channel before installing the next board.

18
Install Remaining Boards and Reinforcing C-Tubes

Install each board in sequence, pressing the tongue-and-groove edges fully together before moving to the next board. Every tongue-and-groove joint must be completely seated: a partially seated joint leaves a visible gap and weakens the fence panel.

After boards 2, 5, 8, and 11, insert a reinforcing C-tube into the hollow channel of those boards. The C-tubes add structural rigidity and prevent the boards from flexing under wind pressure.

Remember the C-Tubes. C-tubes go into boards 2, 5, 8, and 11. It is easy to forget these during installation. Slide each tube in from the end of the board before installing the next board on top of or beside it.
Six-step diagram for fence line post anchoring: mark, drill, insert, hammer, sleeve, lock

Step 18: Anchor fence line posts with expansion bolts (mark - drill - insert - hammer - sleeve - lock)

19
Fit the Final Board

The final board usually needs to be trimmed to fit the remaining space. Remove the male tongue from that board by ripping a thin cut off the tongue edge so it fits flush against the wall or post. For vertical installations, also provide the same lower relief cuts as the first board.

For horizontal boards, cut to match the width of the remaining space and maintain the 2.5mm expansion gap on the constrained side.

20
Install Top Rail, Trim, and Post Caps

Mark the top-rail bracket positions on each post. Screw the top rail to the corner brackets first, then drive the in-channel screws along the rail to secure it. Once the top rail is fixed, add the post side trim strips to cover any exposed edges between the boards and the post face. Install the fence post caps on each line post and the gate post end caps.

Install Post Caps Last. Do not install post caps or end caps until all fence boards are installed and you have confirmed everything looks correct. Caps are the final step, not an intermediate one.
Diagram showing tongue-and-groove WPC boards with C-tube reinforcing inserts at positions 2, 5, 8, and 11

Steps 19-20: Install WPC slat boards tongue-and-groove, with C-tube reinforcers inside boards 2, 5, 8, and 11

Fence Panel Installation Checklist


Part 3
Installing and Setting the Push-Button Keypad Lock

The included gate lock is a fully mechanical push-button keypad lock. It requires no batteries and no wiring. The code is set using a small rotating dial on the back of the keypad panel, not from the outside. Read this section in full before starting, especially the notes on spindle orientation, which is the most common installation mistake.

Before You Drill: Press the C button (the clear button) on the front of the keypad and test the latch by pressing any code sequence. Get familiar with how the latch moves before installing the lock in the gate. Also confirm the latch bar is oriented horizontally, not vertically, before drilling any holes.
Lock parts diagram showing all components and handle direction change steps

Keypad lock components and pre-installation handle direction adjustment

L1
Mark and Drill the Holes

The lock package includes a paper template printed at actual size. Tape the template to the inside face of the gate door at your desired lock height. The template shows three holes to mark:

  • One 15mm hole in the center for the spindle
  • Two 10mm holes for the fixing bolts

Drill all three holes straight through the door from the inside face to the outside face. Accuracy matters here: crooked holes will make the spindle stiff or cause the lock to sit at an angle.

L2
Install the Latch Bolt

Drill a 27mm diameter hole into the door edge to a depth of 90mm. This hole accepts the latch bolt body. Then chisel a shallow 3mm recess around the hole opening so the latch face plate sits flush with the door edge surface. Insert the latch bolt into the hole and fix the face plate.

Critical: Latch Must Be Horizontal. The latch bar inside the latch body must be oriented horizontally when installed. If the latch is vertical, the lock will jam and cannot be opened or closed properly. Check this before drilling the edge hole.
Code setting diagram: dot inward = not in code, dot outward = in code

Lock Step 2: Code setting diagram - dot outward includes that digit, dot inward excludes it

L3
Install the Spindle

Feed the spindle through the 15mm center hole from the inside of the door. The spindle connects the inside handle (on the keypad panel side) to the outside handle.

Spindle Orientation Is Critical. The triangular symbols on the spindle must point toward the handle on each end. The spring end of the spindle must face toward the keypad panel (the outside panel). If the spindle is installed backward, pressing the correct code will not open the lock.

The spindle may feel stiff at first. This is normal: it loosens slightly after a few uses as the mechanism seats itself. Do not force it.

Installation diagrams showing paper template placement, horizontal latch position, and spindle triangle orientation for right-hand vs left-hand gates

Lock Steps A-C: Use the paper template, confirm latch is horizontal, and orient spindle triangles toward handles

L4
Fix the Lock Panels to the Door

Place a neoprene seal behind each panel (the internal panel on the inside face, and the keypad panel on the outside face). The neoprene seals protect the lock body from moisture. Pass the fixing bolts through the two 10mm holes and tighten them until the panels are held firmly against the door face.

Do not over-tighten. The goal is a firm, stable fit. Over-tightening can distort the panels or crush the neoprene seals.

Gate Thickness: The lock works on gates 30mm to 70mm thick. If your gate falls outside this range, contact the YSHI team. A cut guide is printed in the manual for shortening the fixing bolts to match thinner gates.
L5
Install the Strike Plate

With the lock installed and the gate in its closed position, use the latch bolt position to mark where the strike plate needs to go on the latch-side post. Cut a 1mm deep rebate (a shallow recess) in the post surface so the strike plate sits flush. Fix the strike plate with one screw first and test the latch engagement. If everything closes and latches correctly, add the second screw.

L6
Set Your Entry Code

The code is set from the back of the keypad panel using small rotating buttons. Each button has a dot on it. When the dot faces outward (away from the panel, toward the letter G), that button is part of your code. When the dot faces inward (toward the panel, toward the letter F), that button is not part of your code.

To set your code:

  • Use a flat-head screwdriver to rotate the buttons
  • Rotate outward (toward G) for buttons you want in your code
  • Rotate inward (toward F) for buttons you do not want in your code
  • Your code can be 4 to 7 digits and the buttons can be pressed in any order to unlock
Test With the Gate Open. Because the gate latches automatically when it closes, always test your code with the gate held open before letting it latch. This confirms the code works before you are locked out. Press C (the clear button) first, then enter your code.

This is a fully mechanical lock. There is no reset from the outside. If you forget your code, the lock must be removed from the door to access the code-setting buttons on the back.

Changing the Handle Direction. If your gate is hinged on the right but you need the handle on the left (or vice versa), you can reverse the handle direction. Loosen the small screw at the base of the handle, pull the handle off the spindle, rotate it 180 degrees, and refit it. Retighten the screw.

Care and Maintenance

WPC composite boards require almost no maintenance compared to natural wood. They will not rot, warp, split, or attract termites. You do not need to paint, stain, seal, or treat them.

Cleaning the Boards

Rinse with clean water and mild dish soap. A soft brush or cloth works well for surface dirt.

  • No harsh solvents or chemical cleaners
  • No metal scrapers or abrasive pads
  • No pressure washing at close range
  • Rinse after salt-air exposure (coastal areas)

Annual Hardware Check

Once a year, walk the fence and gate and inspect the following:

  • Anchor bolts: confirm still tight
  • Hinge screws: retighten if any movement felt
  • Channel screws: confirm top rail is still secure
  • Hinges and caster: apply light oil if swinging feels stiff
  • Rail bases: clear any debris that has accumulated

Debris and Drainage

Remove any leaves, dirt, or debris that collects along the bottom channel and rail bases. Standing moisture trapped by debris is the one thing that can affect long-term performance of the metal hardware. Keep drainage clear.

What You Never Need to Do

  • Paint or stain the boards
  • Seal or waterproof the boards
  • Sand or refinish any surface
  • Treat for rot or insects
  • Replace boards due to normal weathering

Troubleshooting

P1 - The latch pops out or jams when the gate closes
Cause: The latch bar is not oriented horizontally, or the lock panels are not sitting vertically on the door face. Loosen the fixing bolts slightly, realign the panels so they are perfectly vertical, and confirm the latch bar inside the latch body is horizontal. Re-tighten and test.
P2 - The gate opens without a code, or the correct code does not open the gate
Cause: The spindle is installed in the wrong orientation. Remove the lock panels and recheck the spindle: the triangular symbols must point toward the handles on each side, and the spring end must face the keypad panel (outside). Reinstall and retest.
A fence board is bowing outward between posts
Cause: The reinforcing C-tubes were not installed, or boards are missing spring clips. Check that C-tubes are inserted into boards 2, 5, 8, and 11. Confirm all three spring clips on each post are engaged with the board edges.
There is a visible gap between two fence boards
Cause: The tongue-and-groove joint between those boards is not fully seated. Boards need firm pressure to fully lock together. Use a rubber mallet and a block of scrap wood to gently tap the board edges together without marking the surface.
The gate scrapes or drags on the ground when swinging
Cause: The hinge-side post has settled slightly or the caster wheel is not rolling freely. Check that the post is still plumb and that the caster wheel spins without resistance. Apply a small amount of light oil to the caster axle if needed.

Shop the WPC Composite Fence and Gate System

Everything you need to build a low-maintenance, weather-resistant fence and gate. In stock and shipping from San Diego, CA.

Shop Fence Systems Talk to Our Team

Visit Our Showroom

See the WPC Composite Fence and Gate system in person at our retail showroom in Santee, California.

10926 Woodside Ave Suite A, Santee, CA 92071

Monday - Friday, 8am to 4pm

Phone: (858) 261-4068

Questions about your installation? Our team has hands-on experience with the WPC Composite Fence and Gate system and can walk you through any step. Call us at (858) 261-4068, Monday through Friday, 8am to 4pm Pacific. You can also visit the showroom to see the system in person before you buy.

© 2024 YouShouldHaveIt - youshouldhaveit.com - 10926 Woodside Ave Suite A, Santee, CA 92071

YouShouldHaveIt.com and SlatSolution.com are sister brands under Highlander Home Inc. Different brands, same family.